|
Invitation to tender with Delta-Green
Fully plantable steep slope manufactured with Delta-Green:
All steel parts
with at least 350g/m² special galvanisation (galfan), with a corrosion
resistance of at least 1000 hours salt spray test pursuant to DIN 50021.
Connection of elements to one another by means of welded eyes and push
fasteners.
System manufacturer certified in accordance with ISO 9001:2000.
Reinforcement mesh according to static calculation.
All verifications are to be carried out before award of contract.
Accounting per m² surface area.
Earthworks are separately accounted.
1.1 Deliver Delta-Green system or equivalent and install in accordance with the manufacturer's instructions. Compact fill to 97% Proctor. Slope inclination .... degrees (between 60° and 70°)
.... m² at € .... = € ....
2.1. Carry out spray seeding. .... m² at € .... = € ....
Supplier identification: Rothfuss GmbH u. Co. KG Geotechnics Office Schlosshaldenstraße 7 71282 Hemmingen Tel.: 07150/95 72-0 Fax: 07150/95 72-72 or equivalent
|